2019 Bond Projects

Background

Hermiston School District serves more than 5,000 students in five elementary schools, two middle schools, and one high school. It is the largest school district in Eastern Oregon and among the fastest-growing. Due to the area's increasing population, the district is facing substantial student enrollment growth. The previous school bond to address capacity was approved over ten years ago. To temporarily address this growth, the school district has modular classrooms that during the 2018-19 school year held over 1,000 students. Measure 30-130 is designed to provide funds for additional building capacity for students and to reduce the number of leased modular classrooms.

What is included in Hermiston School Bond Measure 30-130?

Measure 30-130 would raise $82,735,000 through bonds. These funds would qualify for approximately $6,500,000 in state matching grant dollars. The funds will address student capacity demand and needs faced at the elementary and high school levels created by increased student enrollment. Dollars will be used to fund the following projects.

Districtwide Projects

Desert View Elementary School

Hermiston School District Logo

Project consists of a new 16’ wide metal roof structure over an existing pedestrian walkway, a new 6’ wide metal roof structure over a replacement pedestrian walkway, the relocation of accessible ramp, and new paving.

A construction site with a concrete walkway and several metal poles.
A construction site with a concrete walkway and several metal poles.
A construction site with a concrete walkway and several metal poles.

Highland Hills Elementary School

Hermiston School District Logo

Project consists of work phased over the summer of 2023 (Phase 1) and the summer of 2024 (Phase 2).

Photo of the renovated courtyard area

Phase 1, is primarily site work and includes; revised bus and parent drop-off areas, new and renovated parking, new stormwater facilities, new fencing and security, renovated courtyard area, new and renovated pedestrian canopies, removal of existing modular classrooms and a new covered play area.

Photo of the renovated pedestrian canopies
Photo of the renovated parking

Phase 2, is primarily interior renovation work and includes; ADA barrier removal, security upgrades, interior renovations to the admin suite and library, HVAC upgrades to the North and South classroom buildings, and the installation of new playground equipment.

Rocky Heights Elementary

Rocky Heights Elementary Logo

Groundbreaking - Apr 13, 2021

A group of people are in a field

Groundbreaking - Apr 13, 2021

A group of people are standing on a field holding shovels

Groundbreaking - Apr 13, 2021

A group of people are standing on a field holding shovels

Groundbreaking - Apr 13, 2021

A group of people are standing on a field.

Groundbreaking - Apr 13, 2021

A close-up of a shovel stuck in the ground.

Groundbreaking - Apr 13, 2021

Aug 11, 2021 - Oct 23, 2021

Loma Vista Elementary

Loma Vista Elementary Lions Logo
A group of people are standing in a field. They are holding shovels.

Groundbreaking - Apr 13, 2021

A group of people are standing in a field. They are holding shovels.

Groundbreaking - Apr 13, 2021

A group of people are standing in a field. They are holding shovels.

Groundbreaking - Apr 13, 2021

A group of people are standing in a field. They are holding shovels.

Groundbreaking - Apr 13, 2021

A group of people are standing outside.

Groundbreaking - Apr 13, 2021

Time lapse: Oct 9, 2021 - Oct 23, 2021

HHS Softball Fields

HHS Softball Fields Logo

Groundbreaking - Sept 29, 2020

Photo of heavy equipment ready for groundbreaking

Groundbreaking - Sept 29, 2020

Photo of admin team in front of heavy equipment at groundbreaking

Groundbreaking - Sept 29, 2020

Photo of a CAT during the groundbreaking

Groundbreaking - Sept 29, 2020

Photo of heavy equipment at groundbreaking

Groundbreaking - Sept 29, 2020

Photo of bulldozer moving dirt

Groundbreaking - Sept 29, 2020

Photo of a dirt pile

Groundbreaking - Sept 29, 2020

Photo of CAT moving dirt and old structure

Groundbreaking - Sept 29, 2020

A construction site with a fence around it.

Progress - Feb 23, 2021

A construction site with a fence around it.

Progress - Feb 23, 2021

A construction site with a fence around it.

Progress - Feb 23, 2021

A baseball field with the stadium in the background.

Progress - Feb 23, 2021

The softball team standing on the finished field

Grand Opening - Sep 21, 2021

A group of people are cutting a red ribbon with large scissors.

Grand Opening - Sep 21, 2021

A group of people are cutting a red ribbon with large scissors.

Grand Opening - Sep 21, 2021